400 kV Overhead Power Lines

OHL 400 kV

Porțile de Fier – Anina – Reșița

Commissioning: 2024

OHL 400 kV

Cernavodă – Stâlpu and connection to
Gura Ialomiței power station

Commissioning: 2024

Conversion to 400 kV of overhead power line Porțile de Fier – Reșița – Timișoara-Săcălaz-Arad / 400 kV Porțile de Fier – (Anina) – Reșița

  • Nume: 400 kV OHL Porțile de Fier – Anina – Reșița
  • Country: Romania
  • Key features: 400 kV OHL, 81.08 km of single circuit with three 300/69 ACSR conductors per phase, OPGW installation and a circuit with a 170/95 ACSR conductor.
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary namer: TRANSELECTRICA SA, Romania
  • Date of commissioning: Ongoing

400 kV Reșița, Romania – Pancevo, Serbia Interconnection

  • Name: 400 kV overhead power line Reșița – Pancevo
  • Country: Romania
  • Key features: 400 kV OHL, 62.4 km of double circuit, three 300/69 ACSR conductors per phase, OPGW and ACS. Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary namer: TRANSELECTRICA SA, Romania
  • Date of commissioning: 30.03.2018

400 kV quad circuit from New Mirfa G / S to Central S / S Junction

  • Name: 400 kV overhead power line New Mirfa G / S – Central S / S
  • Country: Abu Dhabi, EAU
  • Main features: 400 kV OHL, quadruple circuit, two 400kV circuits with ACSR / AW Cardinal conductor per phase and two 220kV circuits with ACSR / AW Dove per phase, 101 km.
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: TRANSCO, Abu Dhabi
  • Date of commissioning: 2017

400 kV double circuit from Central s / s to Al Faya

  • Name: 400 kV overhead power line Central s / s – Al Faya
  • Country: Abu Dhabi, EAU
  • Key features: 400 kV OHL, 53 km of double circuit, four ACSR / AW conductors per phase.
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: TRANSCO, Abu Dhabi
  • Date of commissioning: 2017

400 kV double circuit from New Ruwais G / S to New Mirfa G / S

  • Name: 400 kV overhead power line New Ruwais G / S – New Mirfa G / S
  • Country: Abu Dhabi, EAU
  • Key features: 400 kV OHL, 80 km of double and quad circuit, ACSR / AW Dove conductors per phase
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: TRANSCO, Abu Dhabi
  • Date of commissioning: 2015

Supply of towers and complete installation for 400 kV to connect IPP3 S /S

  • Name: 400 kV overhead power line connection to substation IPP3
  • Country: Jordan
  • Key features: 400 kV OHL, 10 km of double circuit
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310
  • Date of commissioning: 2013

Supply of towers and complete installation for the modification of the 400 kV Amman North – Amman East

  • Name: 400 kV overhead power line Amman North – Amman East
  • Country: Jordan
  • Key features: 400 kV OHL, 5 km of double circuit
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310
  • Date of commissioning: 2013

400 kV OHL Arad-Nadab, Romania

  • Name: 400 kV overhead power line (OHL) Arad-Nadab
  • Country: Romania
  • Key features: 400 kV OHL, 33.8 km of single circuit
  • Beneficiary name: Transelectrica SA Romania
  • Date of commissioning: 2009

OTHER PROJECTS

OTHER PROJECTS

Project
Romania

  • Name: 400 kV overhead power line OHTL  Oradea – Nadab – Beckecsaba
  • Country: Romania
  • Key features: 400 kV OHL, 72.1 km of single circuit and 20.8 km of double circuit.
  • Beneficiary name: Transelectrica SA Romania
  • Date of commissioning: 2008

Project
Jordan

  • Name: 400 kV overhead power line Amman East Station
  • Country: Jordan
  • Main features: 400kV overhead line, 19.2 km of double circuit.
    Complete design, calculation, pole fabrication, civil works, pole and conductor installation, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 2008

Project
Jordan

  • Name: 400 kV overhead power line Samra – Amman North
  • Country: Jordan
  • Main features: 400kV overhead line, 26 km of double circuit.
    Complete design, calculation, pole fabrication, civil works, pole and conductor installation, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 2004

Project
United Arab Emirates

  • Name: 400/220 kV overhead power line insulation replacement 
  • Country: Abu Dhabi, EAU
  • Key features: Insulation replacement for the following 400/220 kV: Al Wathba-Ramah, Al Wathba-Shahama, Mirfa-Madinat Zayed & Shahama-Al Dahma
  • Beneficiary name: ADWEA Abu Dhabi
  • Date of commissioning: 2004

Project
Jordan

  • Name: 400 kV overhead power line Aqaba-Amman
  • Country: Jordan
  • Main features: 400kV double circuit overhead line, 2.7km
    Complete design, calculation, pole fabrication, civil works, pole and conductor installation, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 2003

Project
Romania

  • Name: 400 kV and 220 kV overhead power line insulators and fibre optic cables
  • Country: Romania
  • Key features: Supply and installation of insulators and OPGW on 1.200km of existing 400 kV and 220 kV overhead lines.
  • Beneficiary name: TRANSELECTRICA SA, Romania
  • Date of commissioning: 2003

Project
Jordan

  • Name: 400 kV overhead power line Jordan – Syria
  • Country: Jordan
  • Main features: 400kV overhead line, 41 km of double circuit and 58 km of single circuit.
    Complete design, calculation, pole fabrication, civil works, pole and conductor installation, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 1999

Project
Mexico

  • Name: 400 kV overhead power line Malpaso – Escarcega
  • Country: Mexico
  • Key features: 400 kV Malpaso – Escarcega, 20 km of 400/230 kV overhead lines
  • Beneficiary name: The Federal Electricity Commission
  • Date of commissioning: 1999

Project
Romania

  • Name: 400 kV overhead power line Sibiu – Arad
  • Country: Romania
  • Key features: OPGW installation, re-insulation, relocation of a part of the line for a circuit, 330 km
  • Beneficiary name: CONEL, Romania
  • Date of commissioning: 1998

Project
Romania

  • Name: 400 kV overhead power line OPGW installation
  • Country: Romania
  • Key features: OPGW installation on 450 km of 400 kV overhead transmission lines on the Romanian transport network
  • Beneficiary name: CONEL, Romania
  • Date of commissioning: 1997