Project
Romania

  • Name: 400 kV overhead power line OHTL  Oradea – Nadab – Beckecsaba
  • Country: Romania
  • Key features: 400 kV OHL, 72.1 km of single circuit and 20.8 km of double circuit.
  • Beneficiary name: Transelectrica SA Romania
  • Date of commissioning: 2008

Project
Jordan

  • Name: 400 kV overhead power line Amman East Station
  • Country: Jordan
  • Key features: 400 kV OHL, 19.2 km of double circuit.
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 2008

Project
Jordan

  • Name: 400 kV overhead power line Samra – Amman North
  • Country: Jordan
  • Key features: 400 kV, 26 km double circuit.
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 2004

Project
United Arab Emirates

  • Name: 400/220 kV overhead power line insulation replacement 
  • Country: Abu Dhabi, EAU
  • Key features: Insulation replacement for the following 400/220 kV: Al Wathba-Ramah, Al Wathba-Shahama, Mirfa-Madinat Zayed & Shahama-Al Dahma
  • Beneficiary name: ADWEA Abu Dhabi
  • Date of commissioning: 2004

Project
Jordan

  • Name: 400 kV overhead power line Aqaba-Amman
  • Country: Jordan
  • Key features: 400 kV OHL, 2.7 km of double circuit
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 2003

Project
Romania

  • Name: 400 kV and 220 kV overhead power line insulators and fibre optic cables
  • Country: Romania
  • Key features: Supply and installation of insulators and OPGW on 1.200km of existing 400 kV and 220 kV overhead lines.
  • Beneficiary name: TRANSELECTRICA SA, Romania
  • Date of commissioning: 2003

Project
Jordan

  • Name: 400 kV overhead power line Jordan – Syria
  • Country: Jordan
  • Key features: 400 kV OHL, 41 km double circuit and 58 km single circuit.
    Complete design, calculation, manufacture of towers, civil works, assembly of towers and conductor, commissioning.
  • Beneficiary name: NEPCo Amman PO Box 2310 PO
  • Date of commissioning: 1999

Project
Mexico

  • Name: 400 kV overhead power line Malpaso – Escarcega
  • Country: Mexico
  • Key features: 400 kV Malpaso – Escarcega, 20 km of 400/230 kV overhead lines
  • Beneficiary name: The Federal Electricity Commission
  • Date of commissioning: 1999

Project
Romania

  • Name: 400 kV overhead power line Sibiu – Arad
  • Country: Romania
  • Key features: OPGW installation, re-insulation, relocation of a part of the line for a circuit, 330 km
  • Beneficiary name: CONEL, Romania
  • Date of commissioning: 1998

Project
Romania

  • Name: 400 kV overhead power line OPGW installation
  • Country: Romania
  • Key features: OPGW installation on 450 km of 400 kV overhead transmission lines on the Romanian transport network
  • Beneficiary name: CONEL, Romania
  • Date of commissioning: 1997